Impaired, TMDL Required (1)
2018 Priority Waters (2)
| Impaired, No Total Maximum Daily Load Required, Part B |
| Completed and Approved TMDL, Part D |
| Altered by Flow Regulation, Part F |
Impaired Waterbody (3)
Vermont Significant Wetlands (4)
Water Body, Fluvial Erosion Hazard Area, Special Flood Hazard Area, Floodway, 500 year Flood Hazard Area (5)
Small Streams - 50ft Setback (6)
State Known Constraint (8)
Local Known Constraint (9)
State Possible Constraint (10)
Local Possible Constraint (11)
Vermont Conservation Design - Landscape Scale Components (13)
| HIGHEST PRIORITY |
| PRIORITY |
Vermont Conservation Design - Species and Community Scale (14)
| HIGHEST PRIORITY |
| PRIORITY |
|