Housing (23)
| Single Housing Unit |
| Multiunit |
| Group Quarters |
| Mobile Home |
| Accessory Dwelling Unit |
| Demolition |
| Sesaonal Camp |
Affordable Housing (1)
Communication Tower (0)
Electric Substations (24)
Existing Renewable Energy Sites (8)
| McNeil Biomass-Electricity |
| Wind Site |
| Methane |
| Wood Chip or Pellet Heat |
| Solar Site |
| Hydro Electric |
Preferred Sites (VT Net-Metering Rule) (9)
| Sand or Gravel Pit |
| Brownfield |
Parking Lot (10)
3 Phase Power Lines (Generalized) for Planning (6)
Electric Transmission Line Corridors - corridor lines (5)
Prime Wind: Areas with high wind potential and no state/local known or possible constraints (11)
Base Wind: Areas with high wind potential and a presence of state/local possible constraints (12)
Prime Solar: Areas with high solar potential and no state/local known + possible constraints (13)
Base Solar: Areas with high solar potential + a presence of state/local possible constraints (14)
Vermont Gas (15)
Water Service Area (16)
Existing Wastewater Service Area (17)
Urban Stormwater Impaired Watershed (18)
Dwelling Units by Planning Area (26)
| ≤200 per sq. mile |
| 201 - 600 per sq. mile |
| 601 - 1000 per sq. mile |
| 1001 - 2500 per sq. mile |
| 2501 - 12000 per sq. mile |
Transit Oriented Development (TOD) Overlay Planning Area (27)
Future Land Uses (21)
| Center |
| Enterprise |
| Metro |
| Rural |
| Suburban |
| Village |
Developed (2016 Land Cover) (22)
| Buildings |
| Roads/Railroads |
| Other impervious |
|